Ft Bend: Overview
PROJECT LOCATION: Ft Bend Landfill, TX

LF Owner: WCA
Gas Rights: Ft Bend Power Producers, LLC

GCCS: Installed in April 2011 – 41 vertical gas wells, 5 clean-out tie-ins, 21,000 feet of HDPE pipe (1” to 18”) – Flare expected to be installed by the end of summer 2011…

Estimated Gas Flows (@50% CH4): 1000+ scfm
Carbon: This project is Eligible for Carbon Credits
End-Use Option(s): Power Generation or High-BTU

Project Description: We have a long-term gas rights contract with the WCA. This landfill started accepting waste in 2002 and is expected to open for another 40+ years. The GCCS will be online by summer 2011. The GCCS was built by Enerdyne Power Systems, Inc (EPS) construction arm, Advance One Development, LLC (A1). This site tested out of NSPS for the next 5 years(Tier II test completed in June 2010). We estimate this site flows will increase dramatically over the next several years as the current waste acceptance rate in over 3500-4000tpd. We are seeking for the best end-use option now. This project has several options available from high-btu to power generation… We intend to list the project on CAR within 6 months of commercial operation of the flare.

PROJECT CONTACT:
email
ftbend@landfillgroup.com
  OTHER PROJECTS

Alcoa
Asheville
Bi-County
Big Run
Black Oak
Catawba
Ft Bend
Greenville
Hendersonville
Newton
Oak Grove
Onslow
Pitt
Wewoka
Others
FT BEND IMAGES (click images to launch larger view)
001 002 003 004 005 006 007
008 009 010 011 012 013 014
015 016 017 018 019 020 021
022 023 024 025 026 027 028
022 023 024 025 026 027 028
028