Big Run: Overview
PROJECT LOCATION: Ashland, KY

LF Owner: EnviroSolutions, Inc. (ESI)
Gas Rights: Big Run Power Producers, LLC (BRPP)

GCCS: Installed GCCS system in 2009 and will support the recently expanded and optimized system that includes 70 vertical wells (up from 49) and 128 collection points (up from 70). More than 3,000 standard cubic feet of gas per minute of landfill gas is now being controlled and drawn through the system.

Clean Energy Project Description: BRPP has a long-term gas rights contract with the EnviroSolutions, Inc (ESI). Enerdyne Power Systems is working with ESI to develop a new, state-of-the-art clean energy facility at Big Run that will convert gas produced at the landfill into renewable natural gas. At the landfill's current gas collection rate, the facility will produce enough natural gas to heat approximately 10,000 homes and save the annual equivalent CO2 emissions of 47 million gallons of gasoline.


PROJECT CONTACT:
email
bigrun@landfillgroup.com
  OTHER PROJECTS

Alcoa
Asheville
Bi-County
Big Run
Black Oak
Catawba
Ft Bend
Greenville
Hendersonville
Newton
Oak Grove
Onslow
Pitt
Wewoka
Others
BIG RUN IMAGES (click images to launch larger view)
001 002 003 004 005 006 007
008 009